  PROJECT INFO

Building Type: School Module
Location: BRE, Watford
Completion: 2007
Installation: 1 Weeks
Stored CO2: 83 tonnes


Artist/Architect:
White Design
spacer
Project Engineer:
Integral
spacer
Timber Engineer:
EURBAN
spacer
Client:
Willmott Dixon


PROJECT DOCUMENTS
Download Icon Building Materials Carbon Indicator Case Study: Re-thinking School (34kb)


PROJECT PRESS
Download Icon TTJ: Volume 420, 23/30 June 2007 (565Kb)
Download Icon Building Magazine: Issue 24, 15 June 2007 (1.44Mb)